Project Details

Design for Comprehensive Improvement for the Voghji River Bed and Riverbank Structures

Design for Comprehensive Improvement for the Voghji River Bed and Riverbank Structures




Project Details

Under the project, design was developed for the rehabilitation of an approximately 886 m section of the Voghji River and the improvement of adjacent infrastructure. The works included river channel clearance; excavation and filling works to achieve the design bed levels; construction of new riverbank protection retaining walls and rehabilitation of existing retaining walls; and construction of 14 spillways and fish passages. The designs also included the rehabilitation of pedestrian bridges and railings, installation of a lighting system, construction of access ramps for maintenance equipment, and relocation of existing engineering networks.

An Environmental Impact Assessment (EIA) Report was prepared, underwent environmental expertise, and received a positive conclusion.

Project Data

Funding Institution
"Zangezur Copper Molybdenum Combine" Charitable Foundation
Client
Kapan Municipalty
Co-Executors
--
Country
Armenia
Date
October 2025 – April 2026
Service
Preliminary and Detailed Design Development
More Information
Back to Projects